제품 정보로 건너뛰기
1 6

Kalomo

Kalomo Stainless Steel Grill Grates Grill Replacement Parts for BBQ Backyard Grill BY14-101-001-099 GBC1440WRSB-C GBC1449WBS-C GBC1449WRS-C, Uniflame GBC1030WRS-C GBC1134WRS Cooking Grids Accessories

Kalomo Stainless Steel Grill Grates Grill Replacement Parts for BBQ Backyard Grill BY14-101-001-099 GBC1440WRSB-C GBC1449WBS-C GBC1449WRS-C, Uniflame GBC1030WRS-C GBC1134WRS Cooking Grids Accessories

정가 $78.40 USD
정가 $78.40 USD 할인가

About this item

  • [Reference BRAND and MODEL] Fits Backyard Grill Models: BY14-101-001-099 GBC1440WRSB-C GBC1449-C GBC1449W-C GBC1449WBS-C GBC1449WRS-C. Fits Uniflame Grill Models: GBC1030W GBC1030WRS GBC1030WRS-C GBC1134W GBC1134WRS GBC1343WP-U.
  • [Solid Stainless Steel] All of our grill grates are made of 7MM solid and sturdy stainless steel, strong, durable and long lasting,16 3/8" x 9 1/2"for each grate, 16 3/8" x 28 1/2"for 3pcs total
  • [Perfect Stainless Grill Grates] These cooking grates gas grill parts are made of durable stainless steel with strong oxidation resistance, corrosion resistance and heat resistance. The durability makes them unnecessary to be changed again and again, ideal grill parts for Weber.
  • [Multifunctional BBQ Parts] Add a smoky flavor to your food and heat your food evenly to get delicious barbecue flavor in your backyard or outdoor gourmet gathering.
  • [Note] Our BRAND and MODEL are Reference ONLY! Make sure you measure the size of your original parts and compare with the grill repair kits BEFORE you order
전체 세부 정보 보기